Article
This article contains PT Duta Cendekia's projects in each region, including project details, locations, objectives, and impacts on the community and related industries.
List of Articles
On Monday, Aug 6 2024 our team carried out the installation and installation of the network which is a crucial step in supporting the operation of the Paspampres building located in the National Capital (IKN) of East Kalimantan Province. In this process, various network devices such as access points, core switches, and distribution switches will be installed to ensure stable and efficient connectivity. This installation is designed to meet high communication needs and support various activities in the building.
In addition, the core switch is also installed as a data traffic control center in the network. This device functions to connect various network segments and ensure efficient and secure data distribution between existing devices. With the core switch, data traffic between devices can be properly managed, so that network performance remains optimal.
In addition, distribution switches are also an important part of the installation of this network. Distribution switches function to distribute connections from the core switch to access points and other devices in the building. With a planned network structure and proper device installation, the network in the Paspampres building is expected to operate with high performance and meet complex communication needs.